📍 Confidential      SOLD

  • Land area: 768 decares. The land is classified as “Municipal” with registered ownership rights of the investing company for construction until 2070.
  • Own land plot of 5 decares prepared for the substation of the power plant. The plot is adjacent to the substation where the PV plant will be connected.
  • Building permit for a 45 MW AC PV plant + building permit for an extension of the PV plant with an additional 30 MW AC + 15 MW / 30 MWh BESS (Battery Energy Storage System).
  • Grid connection agreement with ESO (Electricity System Operator) for 45 MW, with an annex for the extension currently expected.
  • Building permit for a 33 kV cable line from the PV plant to its substation – route length: 15,996.43 meters (approximately 16 km).
  • Building permit for a 110 kV cable line from the PV plant substation to the ESO substation – route length: 172 meters.
  • The estimated cost for building the cable lines and the substation is around €4 million, which may increase depending on ESO’s requirements specified in the annex for the plant expansion.
  • The investing company is currently working towards securing PPAs (Power Purchase Agreements) with several regional enterprises for electricity off-take.
  • The PV plant will be located in Northeastern Bulgaria within the territory of ERP North (the regional electricity distributor).

 

“Fully permitted solar energy facility ready for development.”
€110,000 per 1 MWp